Please ensure Javascript is enabled for purposes of website accessibility Ordinance No. 214B - Amendment to Construction - Wabasso MN

Ordinance No. 214B – Amendment to Construction

AN ORDINANCE AMENDING ORDINANCE NO. 214B ADOPTED ON SEPTEMBER 10, 2012, AND TITLED “AN ORDINANCE REGULATING CONSTRUCTION WITHIN THE CITY OF WABASSO.”

The City Council of Wabasso, Minnesota ordains:

Section 1.  Section 1 of Ordinance No. 214B, adopted on September 10, 2012, and titled “An ordinance Regulating Construction Within The City of Wabasso” is amended as follows:

            Section 1.  Definitions.

A.  Structure:  Anything constructed or erected, the use of which requires permanent location on the ground or attached to something having a permanent location on the ground including but not limited to walls, fences, signboards, decks, patios, additions, permanent pools, sheds, whether on skids or permanent foundation, or paving or cementing of any area.

B.  Lot Line:  The property line bounding a lot except that where any portion of a lot extends into a public right-of-way the line of said right-of-way shall be the lot line for applying this ordinance.

C.  Lot Line, Front:  That boundary which abuts an existing or dedicated public street.  In the case of a corner or irregularly shaped lot it shall be the shortest dimensions fronting the public streets abutting the lot or the side which is used as primary access to the property.  The City Council will make final determinations about the designation of the front lot line.

D.  Lot line, Rear:  That boundary of the lot which is opposite the front lot line.  In cases where the rear lot line extends into a platted alley or street, the street or alley line shall be designated as the rear lot line.  The City Council will make final determinations about the designation of the rear lot line.

E.  Lot Line, Side:  Any boundary which is not a front or rear lot line.

F.  Site Plan:  A photographic representation of the anticipated use of the area within the lot lines with sufficient detail to show existing and proposed structures and sizes, distance to lot lines, approximate value of new construction and any other topographic or other features effecting the application for a permit.

G.  Substantial Alteration:  Any additions to any existing structure which alters exterior dimensions and/or its distance from lot lines.

Section 2. This ordinance becomes effective from and after its passage and publication.

Passed by the City Council of Wabasso, Minnesota this 9th day of September, 2019.

Mayor

Attested:

____________________

City Clerk

View the Sewer Rehab Project website for project information and updates.Visit the Site
+
Scroll to Top